Clean Rooms - Class 100K to Class 100

Clean rooms are special temperature controlled rooms where Temperature, Relative Humidity and Particle Count are regulated. In order to attain and maintain the desired conditions in the room, Air Conditioning is Integrated with Air Filtration.

Air Filtration takes place at sub-micronic levels, 0.3micron level to be precise, at a very high efficiency of 99.99%. To prevent contaminants from entering the room, the room is maintained at a positive pressure relative to the adjacent rooms. We are looking for inqueries from South India & Overseas Countries.

Class 100 Cleanrooms with Aluminium Honeycomb Panels

₹ 15,000 /Square Meter Get Latest Price

MaterialGI/ SS
Door FinishingPowder Coated
Height7-10 ft
Noise60-80 Db
BrandMark Air
ColorBlue and White
Panel Thickness50-100 mm
Voltage110/230 V
Frequency50/60 Hz
Size150 Sqft
Filter0.3 micron
IlluminationLED Clean room lights
Type Of BlowersImported High efficiency AC power blowers
Country of OriginMade in India

Minimum order quantity: 150 Square Meter

We custom design manufacture and test Class 100 cleanrooms at the highest quality

Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.

HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.

Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring

Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.

Class 10 Cleanrooms With Honey Comb Panels

₹ 20 Lakh /Piece Get Latest Price

MaterialGI/ SS
Door FinishingPowder Coated
Height7-10 ft
Noise60-80 Db
BrandMark Air
ColorBlue and White
Panel Thickness50-100 mm
Voltage110/230 V
Frequency50/60 Hz
Size150 Sqft

Minimum order quantity: 150 Piece

We design install test and class 10 clean rooms all over India. 

Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.

HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.

Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring

Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.

Modular Cleanroom Class 100000 (ISO-8) to Class 100 (ISO-5)

₹ 3 Lakh /Piece Get Latest Price

Lighting TypeLED/CFL Ceiling mounted
Power3 phase
BrandMarkAir
Door FinishingPowder Coated
Usage/ApplicationMicro-electronics, Pharma, Biotech, Operation Theatre, Aerospace
MaterialMild Steel
Packaging SizeGuard film
Panel Thickness40 to 150mm
Size8ft X 8ft X 8ft to any larger size
ColorRAL9001,RAL9002 etc

In Modular Clean Rooms the entire area is created with Pre-engineered Modular Panels. These panels have two skins on either sides and a rigid in-fill is sandwich between these skins. 

The skin can be of Powder coated aluminium, Prepainted Galvanized Steel, Stainless Steel, High Pressure Laminates or even transparent Glass or Polycarbonate sheets, The in-fill could be Expanded Polystyrene(EPS=Thermocole), Poly Urethane Foam, Paper Honecomb, Rockwool etc. 

The panels are joined in a progressive or non-progressive manner along their ends that are finished as male-female joints such as Tongue-Groove etc. The skins along with the in-fill is rigid and self supporting. These panels are strong enough to stand without any additional supports. 
After the wall panels are assembled with doors at appropriate locations, Ceiling panels are erected on top of the wall panels. Cut-outs as required for Lighting, View Panels, HEPA filters, Diffusers, Utilities etc. is pre-fabricated in the Panels at the factory or can be done at the Site also.

With this Clean Room Structure AHU and HVAC systems are integrated to complete a working Clean Room. 

Cleanliness level in a Clean Room is designated as per international Standards such as US Federal Standard 209E or ISO-14644-1.

Based on the requirement of the Client and his application, we design suitable systems to achieve the desired conditions such as Temperature, Relative Humidity, Cleanliness level etc. in the Clean Room. The desired conditions are achieved by integration of Air-conditioning and filtration.

Filtration takes place at sub-micron level, at 0.3microns level to be precise at a very high efficiency of 99.99%. For the a certain level of Cleanliness to be achieved in a room a certain quantity of air has to be supplied to the room through HEPA filters.

The air entering the room after HEPA filtration is better that Class 100 clean. This air is already cooled and conditioned in the Air Handling Unit to achieve the temperature and RH in the room. The Class 100 air that enters the room, fills the room and carries with it the suspended partlcles and pushes the settled particles at the floor level to the corners of the room, where Return Air Risers are installed to carry the contaminated air to the AHU for reprocessing. 

Though the room condition, mainly the Cleanliness level, is achieved by the AHU and HVAC systems, it can be sustained only by having proper interior finishes in the room. 

Class 1000 or ISO 6 Clean Room With PUF Panels

₹ 4,000 /Square feet Get Latest Price

MaterialGI / SS
Door FinishingPowder Coated
HeightAs per requirement
Noise60 DB
BrandMark Air
ColorBlue and White
Panel Thickness50/60/80/100 mm
Voltage230 V/110 V
Frequency50-60 Hz
SizeCustom
Filter0.3 micron
IlluminationLED Clean room lights
Flooring FinishEpoxy
Type Of BlowersImported High efficiency AC power blowers

Minimum order quantity: 15 Square feet

We design install test and class hundred clean rooms all over India. Our clients include Pharma Companies, Hospitals, Aerospace, Electronics mfg companies & Institutions like ISRO, IIT, IGCAR, IISc, ICMR etc. We specialise in high quality ultra sterile environments.

Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.

HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.

Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring

Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.

Class 1000 Cleanrooms with PUF / Eps Panels

₹ 5 Lakh /Piece Get Latest Price

MaterialGI/ SS
Door FinishingPowder Coated
Height7-10 ft
Noise60-80 Db
BrandMark Air
ColorBlue and White
Panel Thickness50-100 mm
Voltage110/230 V
Frequency50/60 Hz
Size150 Sqft

Minimum order quantity: 150 Piece

We design install test and class 10 clean rooms all over India.  We specialise in high quality ultra sterile environments.

Class 100 Clean Room HVAC system with FFUs

₹ 12 Lakh /Piece Get Latest Price

Product Brochure
Usage/ApplicationIndustrial Use
Capacity10TR of more
BrandMARKAIR

Class 100 Clean Room for Micro/Nano electronics, Optics, IC process / Fabrication with HVAC system using DX condensing units or Chilled Water system, Dessicant based dehumidifier etc to achieve stringent conditions such as 22 + 2 degC, 35% + 5% including utilities. Grid Ceiling with Fan Filter Unit coverage of 70 to 100%

Modular Clean Room Panels

₹ 2,500 /Square Meter Onwards Get Latest Price

Product Brochure
BrandBeardsell / MarkAir
ColorWhite
MaterialPUF
Usage/ApplicationClean Room Partitions and False Ceiling
Size1m wide upto 12m length
Country of OriginMade in India

Clean Room Wall & Ceiling Panels

Modular Clean Room is an easy & less time consuming to instal alternative to conventional Clean Rooms. These can be reoriented or extended or shifted without much difficulty.

Salient Features
Wall & Ceiling systems compatibel with Class 100000 (ISO 8) down to Class 100 (ISO 5).
Clean Room Compatible Doors, Covings, Lighting, View Panels etc. can be easily integrated with our Panels.
One single panel of width 1m X 12.5m can be supplied.
Leak free construction with Tongue & Groove joints.
Options of fire retardant infills such as EPS (thermocole), PUF, Honeycomb, rockwool etc. available
Designed using Fed Std 209E, ISO, cGMP and current industry standards
Return Air Risers embedded within wall panels.
Varied Skin material from precoated, powdercoated, SS304, non-metallic etc.
Panel thickness from 40mm to 150mm.
Easily assembled, rigid & stable, strong enough to take load of people (Walk-on)
Clean Room approved components.

Mark Air’s Modular Wall & Ceiling systems are pre-engineered, (both progressive and non-progressive design available) that offer flexibility for future expansions and/or modification. Prefabricated modular Clean Room Walls are designed as a totally freestanding self-contained room or in conjunction with existing walls. The Ceiling Panels is walk-on type and strong enough to take the load of two adults within one SqM.

Modular panel surfaces are designed to meet all Clean Room needs. Typical skins of the panels are Aluminium Powder coated, pre-painted GI or SS304 of 0.5 to 0.8mm thickness, High Pressure Laminate (HPL) or Clear Glass/polycarbonate. Modular panel’s cores include paper honeycomb, expanded polystyrene (EPS) or Polyurethane Foam (PUF). RAL9001 is our standard panel skin colour, however any colour can be matched.

Quality
Our wall systems can be constructed to meet your exact requirements or preferences using a multitude of surfaces. The surface is protected with a polythene guard film, to be peeled off after installation. The entire construction is made leak free using Silicone Sealant.

Price
Our modular construction will provide your organization with cost savings in design, construction and maintenance. Further these systems could qualify for the accelerated depreciation vs. longer period for conventionally constructed facilities. Your Auditor’s could throw more light on this.

Speed
System construction time reduces by some 30% compared with conventional construction methods.

Flexibility
The fully fabricated panelized wall system design allows the room to be modified, expanded or moved with minimal amount of manpower or facilities interruptions.

Available with Clean Room Accessories such as Air Shower, Garment Storage Cabinet, Cross-over Bench, Air Curtain, Pass Box, Epoxy Flooring etc. and Clean Room Equipment such as Laminar Flow orkstations, Biological Safety Cabinets, Fan Filter Units etc

Class 10000 Clean Room with PUF Panels

₹ 16 Lakh /Piece Get Latest Price

MaterialGI/ SS
Door FinishingPowder Coated
Height7-10 ft
Noise60-80 Db
BrandMark Air
ColorBlue and White
Panel Thickness50-100 mm
Voltage110/230 V
Frequency50/60 Hz
Size150 Sqft

Minimum order quantity: 150 Piece

We design install test and class hundred clean rooms all over India. Our clients Include KLA Tencor ISRO IIT etc. We specialise in high quality ultra sterile environments.

Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.

HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.

Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring

Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.

Clean Room for PCB process / Fabrication

₹ 35,000 /Square Meter Get Latest Price

HVAC & Modular Panelling 

HEPA filtration

Air Handling Unit, Air Distribution
Modular Wall & Ceiling Panels (EPS/PUF), Coving, Doors, Lighting, Epoxy Floor etc.

Clean Room With HVAC

₹ 5 Lakh /Unit Get Latest Price

BrandMarkAir
Door FinishingPolished
ColorWhite
SizeCustom Design
Clean Rooms5 lakhs
I Deal InNew Only

Minimum order quantity: 1 Unit

Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.

HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.

Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring

Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.

Class 100 Clean Room with Honeycomb Panels

₹ 18 Lakh /Piece Get Latest Price

MaterialGI/ SS
Door FinishingPowder Coated
Height7-10 ft
Noise60-80 Db
BrandMark Air
ColorBlue and White
Panel Thickness50-100 mm
Voltage110/230 V
Frequency50/60 Hz
Size150 Sqft

Minimum order quantity: 150 Piece

We design install test and class hundred clean rooms all over India. Our clients Include KLA Tencor ISRO IIT etc. We specialise in high quality ultra sterile environments.

Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.

HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.

Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring

Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.

HVAC System For Clean Rooms

₹ 3 Lakh /Piece Get Latest Price

Product Brochure
UsageIndustrial Use
BrandMarkAir
Size200 Sq.Ft. to any large size (BSL3 Lab)

Minimum order quantity: 1 Piece

Centralized Air Conditioning, DX system or Chilled Water system are part of all Clean Rooms. We undertake HVAC work for Clean Room as part of our Turnkey work, that will also include Clean Room Interiors.

Like Air Conditioning for any area, for Clean Rooms also the AC load is designed. For Clean Rooms, AC system is integrated with specific Clean Room requirements such as Positive or Negative Pressure, Fresh Air or Exhuast, Cleanliness level, Air Changes, Relative Humidity for the activity to be done in the Clean Room etc. A detailed study is done for every job to decide on the type of filtration system/AHU to be suggested.

Mark Air, with its experience of almost 20years, is exposed to various applications compliance requirement and Client related issues such as space, height, investment etc., so we can suggest the right system for a particular application for a particular Client, without compromising on the performance of the Systems.

MarkAir has its own Validation team as part of its Service Team, which will attend to the specific complaints or issues raised by the Client to ensure that there is minimum breakdown. We have more than 400 HEPA filtration equipment and Clean Rooms under AMC or Validation Contract.

Cleanroom Projects

₹ 5,000 /sq ft Get Latest Price

Product Brochure
Service LocationSouth India

Minimum order quantity: 100 sq ft

Tunkey solutions right from conceptual design to validation & handover & beyond. Any application, any cleanliness level. Modular & Nonmodular options available. Typical Scope of work: HVAC, HEPA filtration, air distribution, electrical work, Clean Room Interiors with modular panels, coving, doors, lighting, flooring etc. Any MOC - metallic - GI powder coated, Aluminium, Stainless steel; Non-metallic - FRP, Glass, Polycarbonate, Polypropylene. Warranty & AMC service team available. Many projects under AMC.

Clean Room ISO-8 to ISO-5 - Turnkey

₹ 15 Lakh /Number Get Latest Price

Product Brochure

Dust free & Bacteria free area complete with Modular Walls & Ceiling, Floor, Doors etc. & HVAC system integrated with HEPA filtration to achieve desired conditions in the Clean Room. From Class 100000 to Class 100. Any application, any where.

X

Contact Us

M. Raghu (Manager)
Mark Air Particulate Control Systems
New No. 5A, Old No. 80, 53rd Street, Opposite Anjaneyar Temple, Ashok Nagar
Chennai - 600083, Tamil Nadu, India

Get Directions
Send Email
Share:
Thank youYour Enquiry has been sent successfully.