Design and establishment of Clean Rooms from Class 100000 to Class 100 on Turnkey basis including HVAC Filtration work and Interior work incl. minor civil works.
HVAC Filtration: This work involves finalization of approximate Site layout, working out Heat Load, calculation of AC Tonnage matching the same with Clean Room requirements, taking into consideration various aspects of Client requirements such as positive pressure/negative pressure, dust generation, Air Changes required as per standards, Fresh Air and Oxygen requirement, Fumigation Defumigation requirements, Balancing of Fume exhaust from Rooms or equipments, cross contamination, regulatory compliance such as WHO, Drug Control, ISO, ASHRAE etc. and more importantly Budget.
Once done a Budgetary proposal with drawings is submitted for approval. Once approved and Order confirmed a detailed offer with drawing DQ documents along with Project Schedule is submitted. Then production procurement takes place. A Project Coordinator and Project Engineer are entrusted with the job, who takeover the job and coordinate with the Client to complete the job.
Clean Room Interiors:
Clean Room Wall and Ceiling Panels
Aluminium Covings
Clean Room Door Emergency Exit/Equipment Door
Double Glazed Clean Room View Panels
Clean Room Lighting
Modular Switches and Plug Sockets with provision for concealed wiring. Pendent for utilities such as cables, air/vacuum hose etc.
Epoxy Flooring
Commissioning, Validation Documentation:
Once installation is complete, commissioning is done by commissioning team that also takes care of Validation. As part of Validation, HEPA filter integrity test, Particle Count Test, Air Velocity measurement, Pressure Balancing etc will be done.